Simulation of improvements in the production system of a tannery based on the mapping of its value chain


Authors

DOI:

https://doi.org/10.22517/23447214.24231

Keywords:

Curtiembre, Lean Manufacturing, Mapeo de cadena de valor, Simulación

Abstract

Currenly, organizations constantly seek continuous improvement in their operations, so they face the challenge of being more efficient with their resources. In this way, an improvement strategy based on Lean Manufacturing methodologies was developed in this research, which considers the application of Value Stream Mapping -VSM in a multi-stage value chain, establishing five phases for the improvement of chain processes that consider multiple stages of production, including the choice of the product family, construction of the current map, identification of improvement opportunities, construction of the future map, simulation of the processes and selection of improvement strategy. The tool was applied in a chain of the leather sector, where the main results were obtained that showed the underutilization of spaces in the factory, lost time due to unnecessary movements and displacements. The implementation and simulation of the VSM was essential for the validation of the proposed improvements, which managed to achieve greater productivity and efficiency, considering the decrease in cycle time and lead time.

Downloads

Download data is not yet available.

References

M. Nguyen and N. Do, "Re-engineering Assembly line with Lean Techniques," Procedia CIRP, vol. 40, pp. 590-595, 2016, DOI: 10.1016/j.procir.2016.01.139.

https://doi.org/10.1016/j.procir.2016.01.139

I. Serrano, Análisis de la aplicabilidad de la técnica Value Stream Mapping en el rediseño de sistemas productivos. 2007.

M. Villadiego, "Diseño metodológico para la implementación del Value Stream Mapping en una empresa manufacturerea colombiana dedicada al mercado de ascensores," Universidad NAcional de Colombia Sede Medellín, 2012.

J. P. Womack and D. T. Jones, Lean thinking: Banish waste and create walth in your corporation. 2012.

I. Serrano, C. Ochoa, and R. de Castro, "An evaluation of the value stream mapping tool," Bus. Process Manag. J., vol. 14, no. 1, pp. 39-52, 2008, DOI: 10.1108/14637150810849391.

https://doi.org/10.1108/14637150810849391

P. M. Masuti and U. A. Dabade, "Lean manufacturing implementation using value stream mapping at excavator manufacturing company," Mater. Today Proc., vol. 19, pp. 606-610, 2019, DOI: 10.1016/j.matpr.2019.07.740.

https://doi.org/10.1016/j.matpr.2019.07.740

Z. Huang, J. Kim, A. Sadri, S. Dowey, and M. S. Dargusch, "Industry 4.0 : Development of a multi-agent system for dynamic value stream mapping in SMEs," J. Manuf. Syst., vol. 52, pp. 1-12, 2019, DOI: 10.1016/j.jmsy.2019.05.001.

https://doi.org/10.1016/j.jmsy.2019.05.001

D. Knoll, G. Reinhart, and M. Prüglmeier, "Enabling value stream mapping for internal logistics using multidimensional process mining," Expert Syst. Appl., vol. 124, pp. 130-142, 2019, DOI: 10.1016/j.eswa.2019.01.026.

https://doi.org/10.1016/j.eswa.2019.01.026

J. Wesana, X. Gellynck, M. K. Dora, D. Pearce, and H. De Steur, "Measuring food and nutritional losses through value stream mapping along the dairy value chain in Uganda," Resour. Conserv. Recycl., vol. 150, 2019, DOI: 10.1016/j.resconrec.2019.104416.

https://doi.org/10.1016/j.resconrec.2019.104416

A. Deshkar, S. Kamle, J. Giri, and V. Korde, "Design and evaluation of Lean Manufacturing Framework using Value Stream Mapping ( VSM ) for a plastic bag manufacturing unit.," Mater. Today Proc., vol. 5, no. 2, pp. 7668-7677, 2018, DOI: 10.1016/j.matpr.2017.11.442.

https://doi.org/10.1016/j.matpr.2017.11.442

A.-A. Dadashnejad and C. Valmohammadi, "Investigating the effect of value stream mapping on overall equipment effectiveness: a case study," Total Qual. Manag. Bus. Excell., vol. 30, no. 3-4, pp. 466-482, 2017, DOI: 10.1080/14783363.2017.1308821.

https://doi.org/10.1080/14783363.2017.1308821

G. A. Marodin, A. G. Frank, G. L. Tortorella, and D. C. Fetterman, "Lean production and operational performance in the Brazilian automotive supply chain," Total Qual. Manag. Bus. Excell., vol. 30, no. 3-4, pp. 370-385, 2017, DOI: 10.1080/14783363.2017.1308221.

https://doi.org/10.1080/14783363.2017.1308221

K. Venkataraman, B. V. Ramnath, V. M. Kumar, and C. Elanchezhian, "Application of Value Stream Mapping for Reduction of Cycle Time in a Machining Process," Procedia Mater. Sci., vol. 6, no. Icmpc, pp. 1187-1196, 2014, DOI: 10.1016/j.mspro.2014.07.192.

https://doi.org/10.1016/j.mspro.2014.07.192

A. R. Rahani and M. Al-Ashraf, "Production Flow Analysis through Value Stream Mapping: A Lean Manufacturing Process Case Study," Procedia Eng., vol. 41, no. Iris, pp. 1727-1734, 2012, DOI: 10.1016/j.proeng.2012.07.375.

https://doi.org/10.1016/j.proeng.2012.07.375

W. Faulkner and F. Badurdeen, "Sustainable Value Stream Mapping (Sus-VSM): Methodology to visualize and assess manufacturing sustainability performance," J. Clean. Prod., vol. 85, pp. 8-18, 2014, DOI: 10.1016/j.jclepro.2014.05.042.

https://doi.org/10.1016/j.jclepro.2014.05.042

A. Brown, J. Amundson, and F. Badurdeen, "Sustainable value stream mapping (Sus-VSM) in different manufacturing system configurations: application case studies," J. Clean. Prod., vol. 85, pp. 164-179, Jun. 2014, DOI: 10.1016/j.jclepro.2014.05.101.

https://doi.org/10.1016/j.jclepro.2014.05.101

B. K. Jeong and T. E. Yoon, "Improving it process management through value stream mapping approach: a case study," J. Inf. Syst. Technol. Manag., vol. 13, no. 3, pp. 389-404, 2016, DOI: 10.4301/S1807-17752016000300002.

https://doi.org/10.4301/S1807-17752016000300002

D. Stadnicka and R. M. Chandima Ratyanake, "Minimization of service disturbance: VSM based case study in telecommunication industry," IFAC-PapersOnLine, vol. 49, no. 12, pp. 255-260, 2016, DOI: 10.1016/j.ifacol.2016.07.609.

https://doi.org/10.1016/j.ifacol.2016.07.609

O. Delgado and M. Torres, "Caracterización de las microempresas pertenecientes al subsector cuero en el municipio de 'El Cerrito' Valle del Cauca." Guadalajara de Buga - Colombia, 2001.

M. Nash and S. Poling, Mapping the total value stream. New York, 2008.

M. Rother and J. Shook, "Learning to See Value Stream Mapping to Create Value and Eliminate Muda," Lean Enterp. Inst. Brookline, p. 102, 2003, DOI: 10.1109/6.490058.

https://doi.org/10.1109/6.490058

J. L. Burbidge, "Production flow analysis for planning group technology," J. Oper. Mana, vol. 10, no. 1, pp. 5-27, 1991.

https://doi.org/10.1016/0272-6963(91)90033-T

P. Hines, N. Rich, and A. E. Esain, "Value stream mapping : A distribution industry application Benchmarking," An Int. J., vol. 6, no. 1, pp. 60-77, 1999, DOI: 10.1108/14635779910258157.

https://doi.org/10.1108/14635779910258157

A. Pinzón, N. Morales, D. Rodríguez, J. Saavedra, and C. Alarcón, Guía de producción más limpia para el sector curtiembres de Bogotá. Enfoque en vertimientos y residuos. Bogotá - Colombia, 2015.

Downloads

Published

2020-09-30

How to Cite

Chud, V. L., Bedoya Díaz, I. M., & Paredes Rodríguez, A. M. (2020). Simulation of improvements in the production system of a tannery based on the mapping of its value chain. Scientia Et Technica, 25(3), 394–403. https://doi.org/10.22517/23447214.24231

Issue

Section

Industrial